Situations that can be reviewed
The assessment starts with planned equipment, existing distribution and building constraints to define the circuits, controls and electrical points required.
- A full renovation or room-by-room work
- A new kitchen, bathroom or workspace
- Redistributing sockets and lighting points
- Modernising an older installation
How a request is prepared
Describe the symptoms, location and level of urgency. Photos can add useful context. The team then checks the relevant trade, area and availability before any intervention and its conditions are confirmed.
Safety first
Avoid temporary alterations before the work begins. Report unstable circuits, exposed cables and areas that are difficult to access.